@PHDTHESIS{Khan:538444,
      author       = {Khan, Asif},
      othercontributors = {Niemann-Delius, Christian and Lübbecke, Marco},
      title        = {{D}evelopment of new metaheuristic tools for long term
                      production scheduling of open pit mines},
      school       = {Aachen, Techn. Hochsch.},
      type         = {Dissertation},
      address      = {Aachen},
      publisher    = {Publikationsserver der RWTH Aachen University},
      reportid     = {RWTH-2015-05306},
      pages        = {XII, 102 S. : Ill., graph. Darst.},
      year         = {2016},
      note         = {Veröffentlicht auf dem Publikationsserver der RWTH Aachen
                      University 2016; Aachen, Techn. Hochsch., Diss., 2015},
      abstract     = {Long term production scheduling of open pit mines is a
                      large scale and complex optimization problem that has been
                      extensively discussed in the technical literature since
                      1960s. It seeks to specify such an extraction sequence of
                      ore and waste materials from the ground that maximizes the
                      Net Present Value (NPV) of the operation while satisfying a
                      set of physical and operational constraints. Block model
                      representation of the orebody is commonly used as a basic
                      input for this purpose. The block model discretize the ore
                      deposit into a three dimensional array of regular sized
                      blocks. A real sized open pit mine may contain thousands to
                      millions of blocks of these blocks that may be needed to be
                      scheduled over a time horizon typically ranging from 5 to 30
                      years which makes it a large combinatorial optimization
                      problem. This thesis presents a framework that aims to
                      handle the above mentioned computationally expensive problem
                      of the open pit mines with low to moderate computational
                      cost. To handle the scheduling problem more efficiently the
                      proposed framework converts it into optimum depth
                      determination problem. This so called optimum depth
                      determination problem aims to find the optimum depth to be
                      mined along a particular column of the block model in a
                      certain period. In this way this framework helps to avoid
                      computationally expensive scheduling decisions making
                      process on the block level. The framework then uses a real
                      valued / continuous population based metaheuristic technique
                      to search the solution space for finding optimum or near to
                      optimum solution of this so called optimum depth
                      determination problem and consequently of the production
                      scheduling problem. Different framework specific operators
                      such as solution encoding, back transform, slope
                      normalization etc. are also used during this process. The
                      proposed framework can handle the production scheduling
                      problem with or without the condition of grade
                      uncertainty.Three different case studies have been carried
                      out using Particle Swarm Optimization (PSO), Bat Algorithm
                      (BA) and Differential Evolution (DE). The aim of these case
                      studies was to determine the capabilities and efficiency of
                      the proposed framework and of the respective metaheuristic
                      technique along with of their different variants. By making
                      comparison with the results obtained using CPLEX in terms of
                      computational time and solution quality it was learnt that
                      the proposed procedure can produce results of reasonable
                      quality in relatively shorter period of time with smaller
                      $\%$ gap and standard deviation.},
      cin          = {511410 / 510000},
      ddc          = {620},
      cid          = {$I:(DE-82)511410_20140620$ / $I:(DE-82)510000_20140620$},
      typ          = {PUB:(DE-HGF)11},
      urn          = {urn:nbn:de:hbz:82-rwth-2015-053066},
      url          = {https://publications.rwth-aachen.de/record/538444},
}